Synergrid approval for home batteries in Belgium
A home battery connected to the Belgian electricity grid must communicate safely with the grid. Therefore, it is important that the inverter complies with Synergrid's technical requirements and is correctly listed on the C10/26 list.
What is Synergrid?
Synergrid is the industry organisation of the Belgian electricity and gas grid operators. The organisation represents, among others Fluvius, ORES, Sibelga and RESA and develops common technical requirements for devices connected to the Belgian electricity grid.
Why do these requirements exist?
More and more solar panels, home batteries, charging stations and other energy installations operate simultaneously with the distribution grid. Technical agreements are necessary to ensure that all these devices react safely and predictably.
- Protection of users, installers and grid workers
- Correct synchronisation with voltage and grid frequency
- Safe shutdown during a grid outage
- Maintenance of the stability and reliability of the electricity grid
A strict technical framework
Belgium applies a strict and technically extensive framework for decentralised production and storage devices through C10/11 and C10/26. Therefore, a CE marking alone does not automatically mean that a device may also be connected to the Belgian distribution grid.
For Plug&Play devices that can produce, store or feed back energy, a valid Synergrid approval is also required.
Synergrid approves the inverter
For a home battery, the individual battery cell is generally not approved. The approval relates to the inverter, or to the complete device in which that inverter is integrated.
Battery cells
Store electrical energy for use at a later time.
Inverter
Regulates energy exchange, grid communication, protection and synchronisation. This is the component to which the C10/26 approval generally relates.
Electricity grid
Receives or supplies energy according to the technical conditions of the Belgian grid operators.
What does Synergrid check?
The manufacturer or importer must submit a technical dossier for a model. Synergrid assesses, based on the submitted documents, certificates and test reports, whether the production or storage unit complies with the applicable technical specifications.
Grid protection
The device must react correctly to deviating grid voltage, frequency and other unwanted grid situations.
Anti-islanding
During a grid outage, the device must prevent a part of the installation from remaining energised without control.
Model and firmware
The stated product reference, technical version and relevant firmware must match the approved dossier.
Power and grid behaviour
Among others, the maximum apparent power and the behaviour during energy exchange with the grid are technically assessed.
What is a GLV reference number?
A positively approved production or storage unit receives a unique Synergrid reference. This GLV reference helps users, installers and grid operators to exactly identify the approved device.
Always check the exact model
Checking only the brand name is not sufficient. Also compare the full product reference and any notes in the current Synergrid list. Different variants of the same product may have a different technical version, firmware or approval status.
What if a home battery is not approved?
A Plug&Play device that does not appear in the applicable Synergrid list may not be installed and plugged in according to Synergrid. The use of a non-approved device can also have practical and legal consequences.
Connection may be refused
The grid operator may not accept the registration or connection when the device does not comply with the applicable technical conditions.
Disconnect or replace
The device may be asked to be taken out of use, disconnected or replaced by a compliant model.
Insurance and liability
In the event of damage, an insurer may investigate whether the device was used according to the applicable requirements. Non-compliant use can complicate the assessment of coverage and liability.
Possible measures
Depending on the region, the grid operator and the concrete situation administrative, contractual or other measures may follow.
Developed for connection in Belgium
The Lunergy Hub 2400 AC has gone through the Synergrid approval process. The model can therefore be checked via the official Synergrid environment for approved decentralised production and storage units.
How to check the Lunergy Hub 2400 AC
Always use the most recent online information from Synergrid. Downloaded or older versions of a list may now be outdated.
Open the official Synergrid page
Go to the page for the approval of decentralised production units.
Open the current C10/26 or Plug&Play list
Use the online version that Synergrid refers to at that moment.
Search for “Lunergy”
Then search for the full model name Hub 2400 AC.
Compare the product reference
Check the exact model, application and any technical notes. Also note the stated GLV reference.
Do I need to register my Plug&Play device?
Yes, in many cases registration is mandatory. The Synergrid approval confirms that the device is technically suitable; the registration registers the device with your distribution grid operator. The rules differ per region.
With an inverter power of 2,400 W, the Hub 2400 AC is above the Flemish limit of 800 W. In Flanders, you must therefore register the device within 30 days. In Wallonia and Brussels, every Plug&Play device must be registered, regardless of the power.
Flanders
- Registration is mandatory when the combined inverter power amounts to 800 W or more.
- Without a digital meter, every Plug&Play device must be registered within 30 days after the first commissioning.
- With a digital meter and less than 800 W, registration is not mandatory, unless you want to receive a feed-in tariff or the total installation still amounts to 800 W or more.
Wallonia
Every Plug&Play device must be registered with the distribution grid operator. Which procedure you use depends on the grid operator at your address.
Hub 2400 AC: always registerBrussels
Every Plug&Play device must be registered with Sibelga. If you have both Plug&Play solar panels and a battery, use the correct registration for both components.
Hub 2400 AC: always registerHow do I register my Plug&Play device?
Use the official portal of your distribution system operator. You will find the name of the grid operator and the EAN code of the connection on your electricity bill.
Determine your grid operator
In Flanders, this is Fluvius, in Brussels Sibelga. In Wallonia, it could be ORES, RESA, AIEG, AIESH or REW.
Keep the device and connection details handy
Prepare your EAN code, installation address, brand and model, battery capacity, inverter power and date of commissioning among others. Then follow the questions and document requirements of the chosen portal.
Submit the notification via the official portal
Keep the confirmation
Keep the receipt confirmation and report any later changes according to the instructions of your grid operator. For a pure Plug&Play device, a new AREI inspection is normally not required; however, this may be the case when making modifications to the fixed electrical installation.
Synergrid and home batteries
Is a CE marking sufficient for use in Belgium?
No. A CE marking and a Synergrid approval do not serve the same purpose. For a Plug&Play device that can operate in parallel with the Belgian distribution grid, it must also be checked whether the model is included in the relevant Synergrid list.
Is the battery or the inverter approved?
Usually, the inverter is approved, or the complete device in which the inverter is integrated. This is because the inverter provides the connection, protection and synchronization with the electricity grid.
What do C10/11 and C10/26 mean?
C10/11 contains the technical requirements for production and storage installations that can operate in parallel with the distribution grid. C10/26 is the type approval with which the conformity of a specific brand and model is assessed and registered.
Can I use a model that is not on the list?
Synergrid states that a Plug&Play device whose brand and product reference are not included in the relevant list may not be installed and plugged in.
Do I still need to register an approved battery?
Yes, registration is mandatory for the Lunergy Hub 2400 AC. In Flanders a Plug&Play device with a combined inverter capacity of 800 W or more must be registered within 30 days. In Wallonia and Brussels, every Plug&Play device must be registered. The Synergrid approval does not replace this regional registration.
Check the model before purchase or connection
View the current Synergrid information and always check whether the brand, model and product reference exactly match the device you want to use.

